| Please contact Marian Sherrin if you have a question about the ITS maintenance calendar or outages. |
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
July 2009
|
|
|
|
1
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
8:00am: Removal of UC data and phone lines from Teacher's Center.
Tuesday-Ongoing: Intermittent service on Nextel phones.
3:15pm-3:45pm: Unplanned outage of some campus phones. Required reboot of message lights will occur by 4:45pm.
10:20pm-10:25pm: Urgent outage requred for SOE email maintenance. |
2
7:30am - 8am: Planned outage of two web sites: courses.ucsc-extension.edu and 1ceinternal.ucsc-extension.edu for impletementing latest releases.
7:30am - ?: Unplanned outage of UC Extension Enrollment Manager.
Noon-12:15: Urgent outage required for Drupal security patch installation.
5pm - 7:30pm:
Planned outage of the Ledge-test server for patching.
5pm - 10pm: Planned outage of PPS. |
3
Independence Day (observed)
7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected. |
4 |
5
1am - 6am: Service outage for CruzTime (Campus Calendar)
6am-10am: Planned outage fo Shibboleth for upgrade. |
6
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
7
6am-9am: Planned outage of SOE Servers "sundance" and "moondance" for system upgrade.
6:30am-7am: Planned work on the network at 2155-G Delaware. Possibility of outage (phone and network).
7pm-Wed: Planned outage of UC Ready for server move (tentative). |
8
Tues - 10am: Planned outage of UC Ready for server move (tentative). |
9 |
10
6pm - 8pm: Planned outage of the Ledge server for patching. |
11 |
12
8am - 5pm:Planned outage of the 12KV Power at Porter A, B, C, and D buildings.
1am - 6am: Service outage for CruzTime (Campus Calendar) |
13
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
14
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
15 |
16 |
17
7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected. |
18 |
19
1am - 6am: Service outage for CruzTime (Campus Calendar) |
20 |
21 |
22 |
23 |
24 |
25 |
26
1am - 6am: Service outage for CruzTime (Campus Calendar) |
27 |
28 |
29 |
30 |
31 |
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
August 2009
|
|
|
|
|
|
|
1 |
2
1am - 6am: Service outage for CruzTime (Campus Calendar) |
3
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
4 |
5 |
6 |
7
7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected. |
8 |
9
1am - 6am: Service outage for CruzTime (Campus Calendar) |
10
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
11
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
12 |
13 |
14 |
15 |
16
1am - 6am: Service outage for CruzTime (Campus Calendar) |
17 |
18 |
19 |
20 |
21
7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected. |
22 |
23
1am - 6am: Service outage for CruzTime (Campus Calendar) |
24 |
25 |
26 |
27 |
28 |
29 |
30
1am - 6am: Service outage for CruzTime (Campus Calendar) |
31 |
|
|
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| September 2009 |
|
|
1 |
2 |
3 |
4 |
5 |
6
1am - 6am: Service outage for CruzTime (Campus Calendar) |
7
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
8 |
9 |
10 |
11 |
12 |
13
1am - 6am: Service outage for CruzTime (Campus Calendar) |
14
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
15
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
16 |
17 |
18 |
19
Quarter Begins |
20
1am - 6am: Service outage for CruzTime (Campus Calendar) |
21 |
22 |
23 |
24
Instruction Begins |
25 |
26 |
27
1am - 6am: Service outage for CruzTime (Campus Calendar) |
28 |
29 |
30 |
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| October 2009 |
|
|
|
|
1 |
2 |
3 |
4
1am - 6am: Service outage for CruzTime (Campus Calendar) |
5
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
6 |
7 |
8 |
9 |
10 |
11
1am - 6am: Service outage for CruzTime (Campus Calendar) |
12
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
13
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
14 |
15 |
16 |
17 |
18
1am - 6am: Service outage for CruzTime (Campus Calendar) |
19 |
20 |
21 |
22 |
23 |
24 |
25
1am - 6am: Service outage for CruzTime (Campus Calendar) |
26 |
27 |
28 |
29 |
30 |
31 |
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| November 2009 |
1
1am - 6am: Service outage for CruzTime (Campus Calendar) |
2
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
3 |
4 |
5 |
6 |
7 |
8
1am - 6am: Service outage for CruzTime (Campus Calendar) |
9
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
10
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
11 |
12 |
13 |
14 |
15
1am - 6am: Service outage for CruzTime (Campus Calendar) |
16 |
17 |
18 |
19 |
20 |
21 |
22
1am - 6am: Service outage for CruzTime (Campus Calendar) |
23 |
24 |
25 |
26 |
27 |
28 |
29
1am - 6am: Service outage for CruzTime (Campus Calendar) |
30 |
|
|
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| December 2009 |
|
|
1 |
2 |
3 |
4
Instruction Ends |
5 |
6
1am - 6am: Service outage for CruzTime (Campus Calendar) |
7
Finals
6pm - 10pm: Planned outage of dev server www2-dev for maintenance. |
8
Finals |
9
Finals |
10
Finals/Quarter Ends |
11 |
12 |
13
1am - 6am: Service outage for CruzTime (Campus Calendar) |
14
8am - Noon: Planned maintenance to the production server www2-1. No outage expected. |
15
Grades Due
8am - Noon: Planned maintenance to the production server www2-2. No outage expected. |
16 |
17 |
18 |
19 |
20
1am - 6am: Service outage for CruzTime (Campus Calendar) |
21 |
22 |
23 |
24 |
25 |
26 |
27
1am - 6am: Service outage for CruzTime (Campus Calendar) |
28 |
29 |
30 |
31 |
|
|
| |
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
January 2009
|
|
|
|
|
1
All Day: Unplanned network outages to the EH&S trailers, Science Library, Stevenson Library, College 8 Bldg 7766 |
2
8am - 9am: Planned outage of the emergency electrical circuits at Natural Sciences 2, Annex, and CFAO.
9am - 9:45am: Unplanned outages of Business Objects and FMW
10:20am: Network service restored to the EH&S trailers, Science Library, Stevenson Library, College 8 Bldg 7766
5pm - 6pm: Planned outage of artstream.ucsc.edu
5pm Friday - 10am Saturday:
Planned Library Data Center outage
|
3
8am - 10am:
Planned electrical outage at McHenry Library |
4
1am - 6am: Service outage for CruzTime (Campus Calendar) |
5
Winter Quarter begins
3:20pm: Service restored to library services |
6
Instruction Begins
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5am - 7am: Planned network outage at LML - POSTPONED until 1/7
6:45am - 7am: Planned outage of Ticketing Office services
3pm - 3:30pm: Unplanned outage of CruzID
10:22pm - 8:45am (Wednesday): Unplanned network outage at College 8 ResNet |
7
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5am - 7am: Planned network outage at LML
8:45am: Network restored to College 8 ResNet |
8
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
7am - 8am: Planned outage of OTP server
9am - 11am: Planned outage of Birdcam service
12pm - 2pm: Unplanned outage of SOE LDAP
2:30pm - 2:45pm: Urgent outage of CruzID |
9
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
7:45am - 8am: Planned outage of University Extension web services
9am - 11am: Unplanned outage of Pinnacle and InfCom databases
1:30pm - 1:45pm: Unplanned outage of CruzID
5pm - 7pm: Planned outage of "ledge" server
7pm - 7:15pm: Planned outage of ITS FileMaker Pro server |
10
7:30am - 11:30am
Planned electrical outage at McHenry Library
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
7am - Noon: Service restored to Library services |
| 11
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
1am - 6am: Service outage for CruzTime (Campus Calendar) |
12
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
2:20pm - 2:40pm: Unplanned outage of limited IC services (Ming Ong Server Room network)
2:22pm - 2:25pm: Unplanned outage of CruzNet at 2nd floor Kerr Hall |
13
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5am - 7am: Planned 5-30 minute network outage at Long Marine Lab
5:30pm - 7pm: Planned outage of ledge
9:30pm: Proposed change to DC3 Firewall (RFC99) |
14
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
6:30am - Noon: Planned outage of the campus VPN (vpn.ucsc.edu)
1:30pm - 2:40pm: Unplanned outage of CruzMail (campus email service) |
15
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5am - 7am: CruzMail to require secure settings (RFC: CM-10)
6am - 6:05am: Planned partial network outage at McHenry library
7am - 8am: Planned outages of Time and Attendance databases, Div-Data, Staff HR FMP server, CruzAlert, OTP server
8am - 10:15am: Unplanned outage of OTP server
5pm - 5:30pm: Planned outage of financial.ucsc.edu
5:30pm - 6:30pm:
Planned network maintenance to 2901 Mission and University Business Park. No outage is expected.
11pm - 11:15pm: Planned outage of CUHS-WEB and CUHS-SQL
11:15pm - 11:30pm: Planned outage of FOODPRO |
16
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
3:30am - 3:45am: Planned outage of SACOMP/SHO-PROD
3:31am - 3:45am: Planned outage of UDS-MICROS
4am - 4:15am: Planned outage of CBORD
7:30am - 7:45am: Planned outage of CCURE server
7:30am - 8am: Planned outages to University Extension services
9:45am - 10:24am: Unplanned outage of IT Request
7pm - 4am (Saturday): Planned outage of campus telephone service |
17
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus. |
| 18
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
1am - 6am: Service outage for CruzTime (Campus Calendar) |
19
Martin Luther King Day
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus. |
20
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5:30am - 6am: Planned short outage of AIS & MyUCSC
6am - 9am: Planned outage of SOE services
8am - 10am (Wednesday): Unplanned outage of Live Operator service for the Campus Telephone Directory
9:30am - 10am: Planned outage of IDM/LDAP servers |
21
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
7am - 10am: Planned maintenance on the Campus Data Center network. No outages expected.
10am: Service restored to Live Operator service for the Campus Telephone Directory
12:30pm - 12:45pm: Planned outage of OCA
12:15pm - 1:28pm: Unplanned outage of CRUZCAT, WebPAC, LINK+, OCA ERES e-links
7pm - 7:30pm: Planned outages of COAST services |
22
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
5:30am - 6pm: Planned maintenance in the Campus Data Center. No outages expected.
6am - 8am: Unplanned outage of cFile
|
23
8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.
8:30am: Unplanned outage of Citrix Web interface for Data Warehouse
10am - 11am: Planned outage of IDM
2pm - 7am (Monday): Planned outage of FIS and CruzBuy |
24
All Day: Planned outage of FIS and CruzBuy
All Day: Unplanned outage of Citrix Web interface for Data Warehouse |
| 25
1am - 6am: Service outage for CruzTime (Campus Calendar)
4pm: Service restored to FIS and CruzBuy
All Day: Unplanned outage of Citrix Web interface for Data Warehouse |
26
7am: Service restored to FIS & CruzBuy
8:40am - 8:55am: Unplanned outage of CruzPay
10am - 11:20am: Unplanned outage of IT Request
7pm - 7:30pm: Planned outage of Pinnacle
12:39pm: Service restored to Citrix Web interface for Data Warehouse
5pm - 10am (Tuesday): Unplanned outage of UNEX website |
27
7:30am - 9am
Emergency generator testing at Thimann Labs, Hahn Student Services, Classroom Units, and Health Center.
6am - 9am: Planned outage of SOE File, FTP and License servers
8:45am - 1pm: Planned maintenance with the BirdCam server. No outage expected
10am: Service restored to UNEX website |
28
7:30am - 9am
Emergency generator testing at Cowell College and Infill, Stevenson College and Infill.
9:15am - 5pm: Unplanned intermittant outages with CruzMail
12pm - 1pm: Planned outage of fsaATLAS |
29
7:30am - 9:15am
Emergency generator testing at Baskin Eng., Kresge College, and Infill.
6:45am - 7am: Planned outage of Telephone Outreach Program
9am - 1pm: Unplanned intermittant outages with CruzMail
9:38am - 9:40am: Unplanned network outage in BE
6pm - 8:30pm: Unplanned outage of Micros
7pm - 7:30pm: Planned outages of COAST services
7:15pm - 7:45pm: Planned outage of fsaATLAS
8pm - 8:30pm: Planned outage of LANDesk
8:30pm - 8:45pm: Planned outage of Foundation Accounting
|
30
7:30am - 9am
Emergency generator testing at College 9/10, SS1, SS2, and College 9 Apts.
|
31
7:30am - 9:15am
Emergency generator testing at Sinsheimer Labs, PSB, and Music Center. |
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
February 2009
|
1
1am - 6am: Service outage for CruzTime (Campus Calendar) |
2
All Day: Intermittant unplanned outages of CruzMail
8:30am: Planned network maintenance in the data center. No outage expected. |
3
7:30am - 9am
Emergency generator testing at College Eight.
All Day: Intermittant unplanned outages of CruzMail
5:30am - 6am: Planned short outages of AIS & MyUCSC
7am - 9am: Planned maintenance to SOE LDAP service. No outage expected.
10am: Planned network maintenance on data center firewall
|
4
7:30am - 9am
Emergency generator testing at Nat Sci 2.
9am - 10:30am testing at ISB Bldg., and C/M Apt.
All Day: Intermittant degraded performance of CruzMail
|
5
7:30am - 9am
Emergency generator testing at Earth and Marine, College 9 Dorms, Core West Parking, McHenry Library.
All Day: Intermittant degraded performance of CruzMail |
6
7am - 8:30am
Emergency generator testing at CHP/Comm.
9am - 10:30am testing at SOE 2, C/M Commons, Firehouse/KZSC.
11am - 1pm: Unplanned degraded performance of CruzMail
6pm - 10pm: Planned outage of IT Request |
7
7:30am - 9am
Emergency generator testing at Baytree Bookstore, Long Marine Lab, COH, Humanities, and 2300 Delaware.
12:30pm - 5pm: Planned network and telephone outage at Student Health Center |
| 8
1am - 6am: Service outage for CruzTime (Campus Calendar) |
9
7:19pm - 8:45pm: Unplanned degraded performance of CruzMail
6:30pm - 11:30pm: Unplanned outage of 20 websites (including ITS) and IT Request |
10
7:30am - 9am
Emergency generator testing at Barn G, Emergency Response Ctr., Porter and Oakes College.
8:15am - 10:28am: Unplanned outage to Business Objects
8:21am - 10:30am: Unplanned outage of IT Request
10:30am: 10:35am: Unplanned network outage at Cowell Student Health Center
4pm: (RFC CM-18) Replace NIC cards on CruzMail
6:15pm - 7:30pm: Unplanned outage of CruzMail
6pm: (RFC CM-18): Replace NIC cards on CruzMail |
11
9:30am - 1:30pm: Planned AT&T cable maintenance across from the Student Health Center.
6pm - 7pm: Planned outage of Student Health Center services |
12
11pm - 11:15pm: Planned outage of CUHS-WEB and CUHS-SQL
11:30pm - 11:45pm: Planned outage of FOODPRO |
13
3:31am - 3:45am: Planned outage of UDS-Micros & SHO-PROD
4am - 4:15am: Planned outage of CBORD server
4am - 6am: Planned outage of campus voicemail
7am - 8am: Planned outage for Academic HR FileMaker, Time and Attendance server, CruzAlert servers
7:30am - 7:45am: Planned outage of CCURE
9am - 5pm: Planned outage of OTP server
5pm - 5:30pm: Planned outage of Student Affairs Fixit website
5pm - 8pm: Planned outage of various PBSci Drupal based websites
6:55pm: Planned outage of humweb
7pm - 8am (Monday): Planned outages of COAST services |
14
6am - 7pm
Planned electrical power outage at Thimann Labs and Kerr Hall. Emergency power will be available.
7:30am - 9am
Emergency generator testing at Communications Building, Kerr Hall, Theater Arts, and Portable Generators.
12am - 8pm: Planned outage of Media Services web server and Classroom Infobase
3:10am: Planned outage of frodo
All Day: Planned outages of COAST services |
| 15
1am - 6am: Service outage for CruzTime (Campus Calendar)
All Day: Planned outages of COAST services
7pm - 7am (Monday): Planned maintenance on IT Request. No outage expected. |
16
President's Day
Service restored to COAST services |
17
6am - 9am: Planned outage of SOE file servers
6:30am - 6:45am: Planned outage of Telephone Outreach
11:15am: (RFC CM-26) CruzMail buffer configuration change
7pm - 8pm: (RFC CM-25) Remove old CruzMail webskins - Postponed until 2/24
7pm - 9pm: Planned outage of various Student Health Center servers
8:45pm - 9pm: Planned outage of Foundation Accounting
10pm - 8am (2/18): Unplanned outage of News & Events on campus website |
18
All Day: Planned maintenance to CruzNet. No outage expected
1:45pm - 2:39pm: Unplanned network outage at UCO Lick
7:30pm - 9:30pm: Planned outage of Staff HR servers |
19
7pm - 8:45pm: Planned outage of Business Objects, Infoview
7pm - 9pm: Planned outage of Student Health Center servers
7pm - 11pm: Planned outage for CruzTime
8:15pm - 8:45pm: Planned outage of Pinnacle
8:45pm - 9:15pm: Planned outage of fsaATLAS
9:15pm - 9:45pm: Planned outage for LANDesk
|
20
9:30am - 1:35pm: Unplanned degraded performance of telephone system. (Dial tone and message waiting lights)
10:15am - Unscheduled emergency generator shutdown at Stevenson College for repairs
2pm - 5pm: Planned outage of fsaATLAS |
21 |
| 22
1am - 6am: Service outage for CruzTime (Campus Calendar)
8:20pm - 9:21pm: Unplanned network outage at ResNet College 9 |
23
8am - 9am: Planned outage of the Ticketing Office service |
24
6am - 9am: Planned outage of SOE servers
2:50pm - 1pm (Wed): Unplanned outage of Library Filemaker servers
9pm - 11pm: (RFC: CM-24 and CM-25) Planned upgrade of CruzMail and CruzMail web client. See FAQ for more info. |
25
7am - 8am: Planned outage of santacruztickets.com
9:20am - 11:45am: Unplanned performance issues with CruzMail
1pm: Service restored to Library FileMaker servers |
26
7pm - 8pm: Planned outage of COAST services
8:35am - Midnight: Unplanned outage of CruzPay |
27
6:30am - 7am: Planned (30 second) network outage at Crown & Merrill.
11am - 11:25am: Unplanned outage of CruzPay |
28
Noon - 1:30pm: Unplanned outage of library home page |
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| March 2009 |
1
1am - 6am: Service outage for CruzTime (Campus Calendar)
|
2
6:30am - 11:25am: Unplanned outage of CruzPay
1:55pm - 2:06pm: Unplanned outage of Library Off Campus Access proxy server
2:16pm: Public key authentication disabled on unix.ic.ucsc.edu |
3
8am Tuesday, 3/3 through 12pm Wednesday, 3/4:
Planned outage of the emergency generator at Stevenson Academic and Res. Halls.
5:30am: Planned network maintenance at McPherson. No outage expected.
8am - 5pm (3/5): Planned outage and maintenance to IdM
8:50am - ongoing: Unplanned connectivity problems with CruzPay
9am - 11am: Planned ouatge of LANDesk server. No client impact.
5:30pm - 6:12pm: Unplanned outage of ResNet in Kresge House 04
|
4
7:30am - 7:45am: Planned outage of UNEX website
All Day: Planned outage to IDM
8am - 10am: Unplanned performance degradation of CruzPay
7pm - 7:30pm: Planned outage of COAST services |
5
10:40am - 11:05am: Unplanned outage of Library FileMaker server
5pm: Service restored to IdM
10:15pm - 3am (Friday): Unplanned outage of cFile |
6
3am: Service restored to cFile
8am - 11am:
Planned outage of the emergency power at Porter A & B Dorms. |
7
4am - 10pm: Planned outage of AIS and MyUCSC
All Day: Planned maintenance to UNEX servers |
| 8
1am - 6am: Service outage for CruzTime (Campus Calendar)
All Day: Planned maintenance to UNEX servers |
9
10:20am: Planned outage of humweb.ucsc.edu
10pm: Planned outage of humbweb.ucsc.edu |
10
9pm - 11pm: (RFC: CM-31 & CM-32) Planned changes to CruzMail (reinstate zip files and remove mail restrictions) |
11
7:30am-8:00am: Planned outage of phone service at Shaffer Rd. Bldg.
8am - 12 midnight: Unplanned message light problem on digital phones.
9pm-10pm: Planned outage of CruzID Manager. |
12
7am-8:12am:Planned outage of the following services: Div Data, OTP2, Filemaker Time and Attendance, and WARN server.
7:30am-7:45am: Planned outage of phone service at Shaffer Rd. Bldg (affects 14 people only)
11pm-11:15pm: Planned outage of various Student Affair's Web Applications on CUHS-WEB and CUHS-SQL servers.
11:15pm-11:30pm: Planned outage of University Dining's Food Stuff and Recipe application on the FOODPRO server. |
13
3:30-3:45am: Planned outage for Universtiy Dinings point of sale application (UDS-Micros server). Dining hall will be closed at this time so no expected impact..
3:30-3:45am: Planned outage of Student Housing Online (SHO).
4am-4:15am: Planned outage of CBORD for patching. Impacts University Dining's Odyssey application.
7:30am-7:45am: Planned outage to door access system (CCURE-0) affecting Kerr Hall, Oakes, College 9/10, and Porter colleges.
8am-5pm: Planned Maintenance to CruzID (IDM) to improve performance. No outage anticipated.
Noon-2pm: Planned outage of network and telephone services at campus fleet garage.
2:30pm-3:30pm: Digital phone intermittent message lights due to reset of operating system.
|
14 |
| 15
1am - 6am: Service outage for CruzTime (Campus Calendar)
7am - 6pm: Planned outage of FIS
5:28pm - ongoing: Unplanned network outage at NASA Ames |
16
Instruction Ends
7am - 8am: Planned outages of MOSS and FMP services
Sunday - 10:30pm: Unplanned network outage at NASA Ames
6:10pm - Ongoing:Unplanned outage of Business Objects and FMW |
17
Finals
Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.
5am-7am: Planned network testing. No outage expected.
7:30am - 8am: Planned outage of SOE file servers (FS1 & FS2)
8am-9:45am: MyUCSC (AIS) password reset incident
10:07am-2:08pm: Unplanned outage of Virtual Computer Lab
7pm - 8pm: (RFC: WWW-36) Planned upgrade to Campus Calendar. Short outage expected. |
18
Finals
Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.
5am-7am: Planned network testing. No outage expected.
7pm-8pm: Planned outage of CRT.
8:40pm-9:20pm: Planned outage to to Pinnacle.
9:20pm-10pm: Planned outage to LANDesk.
8pm-Ongoing: Unplanned outage of CRT. |
19
Finals
Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.
Midnight-7:20am: Unplanned outage of CRT. Some files weren't restored until 9:50am. |
20
Finals
Winter Quarter Ends
Midnight-8:15pm :Unplanned outage of DW Business Objects and FMW.
9am-7:30pm: Planned outage of Filemaker.ucsc.edu (Filemaker Production server). Outage could continue over the weekend.
7pm-9pm: Planned maintanence of its-prod-vcenter-1 ESX cluster. SysAdmin may experience console access outages.
|
21
7am - 12pm: (Noon)
Planned outage of the electric power at McHenry Library Old and New Sections.
6:30am - 12pm (noon): Planned outage of library.ucsc.edu, cruzcat.ucsc.edu and eres.ucsc.edu due to above power outage.
8am - 3pm:
Planned outage of the electric power at Porter Administration and Academic Building D.
10am: Planned retirement of unix1.ic.ucsc.edu (public sparc timeshare)
All Day: Planned outage of filemaker.ucsc.edu |
| 22
1am - 6am: Service outage for CruzTime (Campus Calendar)
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
All Day: Planned outage of filemaker.ucsc.edu
7am-8am: Planned outage of Ticket Office/Audience View for OS Updates. |
23
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
6:40-7:00am: Planned Outage of Telephone Outreach.
7:30am-10am: Maintenance work beign done on the Network (HPR-G). No outage expected.
3:30pm-8:15pm: Unplanned outage of email from www2 hosts (as-prod-web-1|2). Blocked due to SPAM originating from site.
7:00pm-9:20pm: Planned outage of Business Objects for maintenace and backup.
9:20pm-10pm: Planned outage of fsaAtlas.
10pm-10:20pm: Planned outage of Foundation Accounting |
24
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
5am-7am: Upgrade on campus network core router Comm-G. No outage expected
7am - 8am: Planned outage of SOE Moodle service
7:30am-10am: Maintenance work being done on the Network (ISP-G). No outage expected.
2:30pm - 6pm: Planned outage of CBORD server
7pm-8pm:Planned Outage of COAST servers for maintenance. |
25
Grades Due
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
7am-9am: Planned outage of SOE project directory for server migration/upgrade.
7:30am-10am: Maintenance work being done on the Network (DC-G). No outage expected.
10am - 10:30am: Planned outage of ResNet
10:05am-10:35am: Unplanned outage of CruzID Manager.
11:30am-1:30pm: Unplanned outage of phones at Crown-Merrill and restore of campus phones. Some may experience message light problems.
7pm-Midnight: Planned outage of COAST Servers. |
26
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
8am - 12pm (Noon)
Planned outage of the electric power at Humanities Lecture Hall.
8am - 4pm: Planned outage of electrical power at Kresge Residence Halls R-6,7,8.
6:45pm-7:20pm: Unplanned campus power outage.
4am-8am: Planned outage to most Wireless Access Points (WAP) for ~5minutes sometime during this period.
7am-9am: Planned outage of SOE project directory for server migration/upgrade.
11am-11:50am: Unplanned outage of InfoView.
5pm-Ongoing: Planned outage of multiple Humanities file services on server file (frodo.ucsc.edu)
6:45pm-Midnight: Unplanned outage of some campus networks and file servers due to unplanned power failure. |
27
Cesar Chavez Day
8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.
All day: Unplanned network failures due to power failure.
Midnight-8am: Planned outage of multiple Humanities file services on server file (frodo.ucsc.edu)
7pm - Monday 7am: Planned outage of CruzBuy for software upgrade. |
28
All Day: Planned outage of CruzBuy for software upgrade. |
| 29
1am - 6am: Service outage for CruzTime (Campus Calendar)
All Day: Planned outage of CruzBuy for software upgrade |
30
Spring Quarter Begins
Midnight-7am: Planned outage of CruzBuy for software upgrade.
Noon-12:44pm: Unplanned outage of Library Directory. |
31
Instruction Begins
5am-7am: Planned 10G upgrade of network (isb-g). No outage is expected.
4:45pm-5:05pm: Unplanned outage of CruzID.
7pm-8pm: Planned outage of COAST servers including email, document mgt, Citrix, and Web Survey.
7pm-9pm: Planned outage of the following production servers: ALI, CCM, Harriet, Phonetics1, its-nav-mon-1 and other ITS dev and test servers.
7pm-8pm: Planned outage of Campus Events Calendary for upgrade fix.
8pm-10pm: Planned outage of ITRequest for upgrade.
8pm-Ongoing: Planned outage of remote access for UC Extension (Conflicker Worm preventive action)
|
|
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
April 2009
|
|
|
|
1
8am - 4pm: Planned outage of stand-by electrical power at the Physical Sciences Building. Emergency power will be available.
Midnight-5pm: Planned outage of remote access for UC Extension (Conflicker Worm preventive action)
Noon-1pm: Planned upgrade to erc-g router power supplies. No outage expected.
7:30pm-9pm: Planned outage of Staff HR services for maintenace. |
2
8am - 4pm: Planned outage of stand-by electrical power at the Physical Sciences Building. Emergency power will be available.
4:15pm-4:25pm: Unplanned outage of CruzID Manager.
7pm-9pm: Rescheduled to 4/9/09: Planned outage of Student Health Services.
7:30pm-9:pm: Urgent Maintenance Outage of ADFS (includes Banner forms and UR Portal).
Evening: Planned urgent CruzID Manager configuration change. No outage expected |
3
8am - 4pm: Planned outage of the emergency generator power at Engineering 2.
|
4 |
| 5
1am - 6am: Service outage for CruzTime (Campus Calendar) |
6
7am-5pm: Cell tower work near College8. AT&T, T-Mobile Cell coverage limited.
3pm - 4:20pm: Unplanned outage of the Academic Information System (AIS)
|
7
7am-5pm: Cell tower work near College8. AT&T, T-Mobile Cell coverage limited.
7:30am-7:45am: Planned outage of library systems.
8am-4pm: Cell tower work near College9/ SocSci.
Noon-3:30pm: Unplanned outage/intermittent service of lecture Webcast server. Problems may continue to be intermittent. |
8
9:30pm-11pm: Cancelled: Planned outage of CruzID. No logins requiring gold passwords available nor password changes.
8am-4pm: Cell tower work near College9/ SocSci. |
9
7pm-9pm: Planned outage of Student Health Services systems for maintenance.
2:32am-11:18pm: Regional fiber cable out affecting cell phone service, some long distance phone service, and internet links outside the local area. Cable is cut between Santa Cruz and Gilroy.
11:59am - 11:18pm: Unplanned outage of BE105 Workstations, IC Unix, WebCT, WWW2, and some Kerberos logins. Believe linked to Cable cut. |
10
7pm-April 12: Planned Outage DWH EFM Surveys. |
11
All Day: Planned Outage DWH EFM Surveys. |
| 12
1am - 6am: Service outage for CruzTime (Campus Calendar)
6am-8am: Planned outage of AIS Campus Solutions 9.0 and MyUCSC.
12:26pm-12:27pm: Unplanned outage of T-1 Network at 509 Swift.
All Day: Planned Outage DWH EFM Surveys. |
13
11:19am-Noon: Unplanned outage of a security firewall (dc3). Other unplanned outages (www, www2, FIS) reported as well. Connection between these is unknown at this time. |
14
9:54am-9:58am: Unplanned outage of Network Internet Service. |
15
4:15pm-5:10pm: Unplanned Power affecting upper campus. Lower campus and off campus buildings (aka Delaware) not impacted.
7am-9am: Planned maintenance of several administrative websites (ada, bas, emergency, lasersafety). No outage expected.
7pm-9pm: Planned outage of CruzID Manager for patching.
7pm-10pm: Planned outage of 2 servers for maintnenace with impact as follows: Filemaker time and attendance databases for CBO, ITS, SHS, UARC, PBSci, etc. Also CruzAlert server.
8pm-9pm: Planned upgrade to CruzMail. No outage expected.
|
16
6am-8am: Planned outage of SOE Server for maintenance.
5pm-Ongoing: Previously unannounced outage of Library data center HVAC causing system instability of serveral library applications
11pm-11:15pm: Planned outage of CUHS-WEB and CUHS-SQL servers hosting various Student Affairs applications for maintenance.
11:15pm-11:30pm: Planned outage of FOODPRO for maintenance.
Midnight-Ongoing (until 4/22): Unplanned network distruption in Porter/Kresge Residences. |
17
Midnight-9:30am: Previously unannounced outage of Library data center HVAC causing system instability of serveral library applications
3:30am-4am: Planned outage of UDS-Micros. No campus impact expected.
4am-4:14am: Planned outage of CBORD hosting Odyssey for maintenance.
7am--7:05am:Cancelled: Planned outage of Audience View/Ticket office for security upgrade.
7:30am-7:45am: Planned outage of CCURE hosting Kerr Hall, Oakes, College 9/10, and Porter exterior doors.
5pm-7pm: Planned outage of ledge-test.
7pm- Ongoing: Planned Outage of UC LMS system.
All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.
|
18
Midnight-2pm: Planned outage of UC LMS system
7am-Monday: Planned outage of FIS for OS upgrade. |
| 19
1am - 6am: Service outage for CruzTime (Campus Calendar)
All Day: Planned outage of FIS for OS upgrade.
All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences. |
20
Midnight-7am:Planned outage of FIS for OS upgrade.
7am-7:05am: Planned outage of AudienceView remote authentication.
7:30am-7:35: Planned maintenance of VPN. No outage expected.
9am-5pm: Planned upgrade to digital phone displays. No outage expected.
All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences. |
21
5:30am-8am: Planned outage of SOE mail for server move.Msgs will stay in the queue and be sent when move is complete.
7am-7:15am: Planned outage of SOE websites for migration.
5:15pm - 8pm: (RFC CM-75) NVRAM replacement on NAS. No outage expected.
6:37pm-9:55pm: Unplaned outage of College 9 phones.
9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.
All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences. |
22
8am-9am: Unplanned message light issues on some phones.
10am - Noon: Planned network outage at SVC/UNEX
7pm-8pm:Planned outage of OTP2 HPA database and DivData.
7pm-8pm: Planned outage COAST Services (email, file, print, and web).
9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.
All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences. |
23
10am-1pm: Planned outage of library file sharing/Samba service, beast.library.ucsc.edu
9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.
7pm - 9pm: Planned outage of Student Health Services |
24
1:30pm-2:45pm: Unplanned outage of network in Sinsheimer Lab.
6pm-8pm: Planned outage of ledge for maintenance. . |
25
9am-5pm: Planned outage for CruzMail (tentative) |
| 26
1am - 6am: Service outage for CruzTime (Campus Calendar) |
27
7am-8am: Planned outage of MOSS and Filemaker servers: its-prod-moss-1, its-prod-sql-5, and fmp-prod-app-1 for maintenance.
7am-10am: Planned outage of Audience View. Users will be able to complete transactions, but no new logins will be available.
Noon-1:30pm: Planned outage of fsaAtlas for upgrade. |
28
5:30am-7am: Planned outage of CruzNet and CruzNet Secure wireless networking.
6am-9am: Planned outage of SOE File Server FS2 for move.
9am-Noon: Planned outage of library file sharing/Samba service, beast.library.ucsc.edu
2:50pm-3pm: Unplanned disruption to CruzMail. |
29
6am - 6:30am: Planned outages for multiple services (Foundation Acct, Telephone Outreach)
7:30am-11am: Planned outage of Engergy Management hub 136 in Engineering 2.
7pm - 10:15pm: Planned outage for multiple services (Business Objects, fsaATLAS, LANDesk, Pinnacle)
7pm-8pm: Planned outage of Singularity for maintenance. |
30
3pm - 4:35: Unplanned error messages in the IT Request Ticket system.
7pm: Planned maintenance of CruzTime (URL redirect). No outage expected.
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
May 2009
|
|
|
|
|
|
1
Midnight-9:55am: Unplanned outage of CruzTime on the web.
11:15pm-11:30: Planned outage of CruzID for maintenance. Users may loose connection momentarily. |
2 |
3
1am - 6am: Service outage for CruzTime (Campus Calendar) |
4
3:30: Planned reboot of CruzNet Router (wlsm2-g). No outage expected. |
5
3:31am-3:51: Planned maintenance on UDS-Micro Dining POS system. No outage expected (dining closed).
5am-8am: Planned maintenance on Comm-g network. No outage expected.
7pm-?: Planned maintenance on WWW. RFC is WWW-51. No outage ezpected.
9:30am-11am: Planned upgrade to CruzID Manager. No outage expected. |
6
10:00am-10:16am: Unplanned Campus Power outage. Delaware not impacted.
8:30am-9:03am: Unplanned outage of ITRequest.
7pm-10pm: Planned outage of Singularity DMS for maintenance. |
7
5:01pm-6pm: Planned outage of Singularity DMS for urgent service pack update. |
8
6:30am-9:30am: Planned Campus Power work at Merril Substation. No outage expected.
7:45am-8am: Planned outage of Extension Exchange Mail for login bug fix. |
9 |
| 10
1am - 6am: Service outage for CruzTime (Campus Calendar) |
11
2:30pm-3pm: Urgent testing of Hanh power supplies.No outage expected. |
12
9:30am - 11am: Planned maintenance to Shibboleth. No outage expected.
11am-3:45pm: Unplanned outage of Connexxus due to Shibboleth change. |
13
7:30pm-9pm: Planned outage of Staff HR services for maintenance. |
14
7pm-9pm: Planned outage of Student Health Services for maintenace.
11pm-11:15pm: Planned outage of CUHS-WEB and CUHS-SQL servers hosting various Student Affairs applications for maintenance.
11:15pm-11:30pm: Planned outage of FOODPRO for maintenance. |
15
3:31am-4am: Planned outage of UDS-Micros. No campus impact expected.
4am-4:14am: Planned outage of CBORD hosting Odyssey for maintenance.
7:30am-7:45am: Planned outage of CCURE hosting Kerr Hall, Oakes, College 9/10, and Porter exterior doors.
9:30am-4:30pm: Unplanned suspension of www2 webform email. |
16
8am-8pm: Planned outage of AIS and MyUCSC portal for maintenance.
5pm-Midnight: Planned upgrade to our Data Center VM Environment. No outage expected.
|
17
1am - 6am: Service outage for CruzTime (Campus Calendar) |
18 |
19
8am - 4pm: Planned outage of the emergency generator at the Fire House. Electrical power will still be available.
6am-9am: Planned outage of SOE Interactive servers sundance, moondance, apache.
7:30am-9am: Planned maintenace to BSOE LDAP servers. No outage expected.
9:30am-11am: Planned maintenance for CruzID. No outage expected.
3:10pm - 3:20pm: Unplanned outage of the CruzID Manager.
7pm-9pm: Planned outage of ITS web dev and test, sql test, phonetics, and its-nav-mon-1 servers for maintenance.
7pm-9pmPlanned outage of web servers (www.ucsc.edu, its-prod-web-01,02 & its-prod-sql-06) for maintenance. The only outage will be to the News and Events and calendar web pages.
7:30pm-8:30pmPlanned outage of the DWH production Database server for testing. |
20
1pm: Unplanned outage of the residential network at College Nine.
5pm - 11pm: Planned upgrade on the DWH system (dwh-prod-ora-1).
5pm - until Noon on 5/21: Planned outage of FMW, Business Objects, and Infoview XI for database upgrades.
6:30pm-9pm: Planned outage of Student Health Services servers for maintenance.
|
21
9:30am-5pm: Planned outage of CruzPay for VM upgrade.
9pm - until morning of 5/22: Planned outage of FMW, Business Objects, and Infoview XI for database upgrades. |
22
7am - 7:30am: Planned outage of Hub282 at Kresge Commons: Bldg 379.
9:30am - 10am: Planned outage of Hub808.resnet at the Village Bldg 7019. |
23 |
| 24
1am - 6am: Service outage for CruzTime (Campus Calendar)
6am-10am: Planned outage of CruzID Manager. |
25
Memorial Day |
26
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7pm - 7:30pm: Planned outage of Pinnacle. Patch installations.
8pm-10pm: Planned outage of www2.ucsc.edu web sites for system maintenance.
8pm-10pm: Planned outage of MySQL server. Apps impacted: IT Request, CRT, Summer Session, Biobibnet, Web Templates, OTP, UR Give, Dept. Directory, Water Project. |
27
6am - 6:30am: Planned outage of Foundation Accounting and Telephone outreach program. Patch installations.
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7:30pm - 9:15pm: Planned outage of Business Objects, Infoview, fsaATLAS, and LANDesk. Patch installations.
4pm - 6pm: Planned outage of the Moira. |
28
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
2pm: Planned work to the delaware-ds distribution switch at 2300 Delaware. No outage expected.
6pm - 7pm: Planned outage of the Student Health Center Point and Click app.
8pm - 8:15pm: Planned outage of the Online Tag Program.
|
29
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
|
30
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
8am - 10am: Planned work to retire dc1, dc2, and dc3 servers. |
| 31
1am - 6am: Service outage for CruzTime (Campus Calendar)
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker. |
|
|
|
|
|
|
| |
| Month |
Sunday |
Monday |
Tuesday |
Wednesday |
Thursday |
Friday |
Saturday |
| June 2009 |
|
1
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7am - 11am
Unplanned outage of the ITS Collab tool.
6pm - 10pm: Planned outage of dev server www2-dev for maintenance.
6:30pm - 9pm: Planned outage of the Student Health Services servers. |
2
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
9am-Ongoing: Unplanned outage of FITC Lab 202 Crown Library Building due to plumbing leak. |
3
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
8am: Unplanned outage of the emergency generator at the Physical Sciences Building.
Midnight-Ongoing: Unplanned outage of FITC Lab 202 Crown Library Building due to plumbing leak.
9pm-Next day: Planned outage of Moira for upgrade. |
4
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
Midnight-3:30pm: Planned outage of Moira for upgrade.
Midnight - 5am: Unplanned maintenance on ITS Collab Tool.
9am-5pm: Planned outage of Student Housing Online (SHO).
|
5
Instruction Ends
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
10am-11am: Planned maintenance to CruzID Manager. No outage expected.
1:15pm - 1:30pm: Unplanned outage/connectivity of CruzPay. |
6
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker. |
| 7
1am - 6am: Service outage for CruzTime (Campus Calendar)
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker. |
8
Finals
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
6am-9am: Planned maintenance to phone trunks. No outage expected.
8am - Noon: Planned work to the production server www2-1. No outage expected.
9pm-midnight: Urgent (unannounced) maintenance of CruzID - rolling log offs possible.. |
9
Finals
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
8am - Noon: Planned work to the production server www2-2. No outage expected.
2:45pm-5:45pm: Unnounced outage of CruzID (Account) Directory.
4:14pm-5:30pm: Unplanned outage of Moira.
8pm-10pm: Planned maintenance on ITR. No outage expected. |
10
Finals
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7:30am-8am: Planned outage of several UC Extension servers/services (email, website, ucscext domain, print server, OneCE, file server, student DHCP).
7pm - 11pm: Urgent Maintenance on WWW, WWW2 (its-prod-web-01 & 02), no outage expected.
9:30pm-9:50pm: Planned outage of CRT for upgrade.
|
11
Finals
Quarter Ends
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7:30am-7:45am: Planned maintence of CCURE-0 Door access.
3:30pm-3:45pm: Planned outage of SHO for critical update.
7pm-9pm: Planned maintenance to IDManager and WWW2. No outage expected.
10pm-10:50pm: Urgent maintenance to Audience View.
11:45pm-midnight: Planned outage of FOODPRO server for maintenance. |
12
Commencements
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
6pm-8pm: Planned outage of ReadyTalk for upgrade.
7pm-8pm: Planned outage of ITS Collaboration Tool for server move.
9pm-11pm: Planned outage of Moira and Listmaint for maintenance. |
13
Commencements
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.
7:15am-1:30pm: Unplanned outage of NASA Ames network connection.
8am-10am: Planned outage of "ad" network login domain. Minimal outage expected.
10am-7pm: Planned outage of CruzBuy for maintenance.
|
| 14
Commencements
1am - 6am: Service outage for CruzTime (Campus Calendar) |
15
6:30am - 2:30pm: Planned electrical outage at Cowell and Stevenson College, plus Chadwick Garden. Emergency generators will be running.
10:30am-11:40am: Unplanned outage of Zimbra mail server. |
16
Grades Due
7am - Noon: Planned electrical work to the Humanities Lecture Hall. Power will be shut down.
6am-9am: Planned outage of SOE Interactive and Compute servers (sundance, moondance, apache) for upgrade.
7pm-10pm: Planned outage of Div Data, Time and Attendance calendars, and WARN DB for OS update.
7pm-10pm: Planned maintenace for ITS-dev-web and ITS-test-web, sql. |
17
6:30am - 6:30pm:Planned electrical work to Crown Merrill Apt. and colleges, Fire Dept. KZSC Tower, and Tower Farm. Emergency generators will be running.
All Day: FITC will be closed due to above electrical work.
9:30am-10:15am: Unplanned outage of PBSci Filemaker Pro DB.
12:15pm-2:15pm: Planned maintenance of Wireless System Manager (WLSM). No outage expected.
7pm-10pm: Planned outage of staff HR servers (DC1, DC2, FS-1, Prod-FMP-1, Shrsrv02) for maintenace. |
18
7am - 7pm: Planned electrical work on power to campus. No outage expected.
5am-7am: Planned outage of CBORD for Summer student upload.
8:05am-8:10am: Unplanned power outage to Comms bldg.
10am-Noon: Planned ResNet outage for upgrade.
3pm-3:30pm: Unplanned outage of Edgar.
5pm-6pm: Planned outage of MOSS for SP-2 upgrade. WWW-75
7pm-10pm: Planned outage of Student Healthe Services servers (APP-1, APP-2, PNC-FS, Web-1, Prod, and SHS-TS-1) for maintenace.
9pm-Midnight: Planned maintenance to CruzMail. No outage expected. CM-77.
11pm-11:15pm: Planned maintenance of CUHS web and SQL servers. No outage expected. |
19
7am - 7pm: Planned electrical work on power to campus. No outage expected.
4am-6am: Planned outage of campus voicemail for maintenance.
7am-7:45am: Planned Outage of CruzNet for upgrade, small (5min) gaps in service may be experienced.
2:50pm-4:10pm:: Unplanned outage of CruzNet wireless system in various locations across campus.
5pm-Midnight: Planned outage of Library Slides Service (slides.library.ucsc.edu)
7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.
7pm-8pm: Planned outage of CruzBuy for vendor maintenance. |
20
7am - 1pm: Planned electrical power outage at McHenry Library. Emergency power will be available.
Midnight-10am: Planned outage of Library Slides Service (slides.library.ucsc.edu)
12:58-2:15pm: Un planned outage of financial.ucsc.edu.
7:30am-10am: Planned outage of Library Services (OCA, CruzCat, Web, Library, Filemaker, Slides, Mail Server). |
21
1am - 6am: Service outage for CruzTime (Campus Calendar) |
22
6:30am-7:00am: Planned outage of University Relations
5:15pm-6:15pm: Planned outage of arts.ucsc.edu for server upgrade.
7pm-7:30pm: Planned outage of Pinnacle for maintenance. |
23
6am-9am: Planned outage of SOE file servers fs1 and fs2 for maintenance.
6:30am-6:40am: Planned maintenance of campus network connection. No outage expected.
9am-11am: Planned maintenace to IDM. No outage expected.
9:30-11am: Planned outage of CruzNetSecure for certificate change.
8pm-10pm: Planned outage of ITRequest for virtual move.
8pm-10pm: Planned outage of www2 databases for maintenance. Websites affected are: Humanities, SocSci, ITS, ehs, Office of Campus Life, Residential Networking, Giving Catalog, Center for Itegrated Water Research. |
24
6:00am-9:30am: Unplanned outage of ITRequest, Biobibnet, & OTP.
8am- 9am: Unplanned service disruption - some email servers running slow. Connections lost.
6:30am-6:40am: Planned upgrade to campus network. No outage expected.
7pm-8pm: Planned outage of COAST servers for maintenance: admbackup, admdb01, admdc01, admdc02, admdc03, admex03, admf01, admprn01, admwa01, admxerox, pbctx01, pbdc01, pbdev01, pbnas01, pbrpts, pbsvcs, uarc-svc01.
|
25
7am - 9am: Planned electrical outage at the Academic Resources Center.
2:12am-10:37pm: Unplanned outage of multiple data center servers including: FIS, CruzBuy, Audinece View, IDM, ITRequest, ITSOps, and as, bo, ur, and WARN update.
10:31am-2:18pm: Unannounced outage of UC Ready.
7pm-8:45pm: Planned outage of Business Objects.
8:45pm-9:15pm: Planned outage of fsaAtlas for maintenance.
9:15pm-9:45pm: Planned outage of LANDesk for maintenance. |
26
11:25am-11:45am: Emergency maintenance to CruzID. Not outage expected.
5pm-6pm: Planned outage on one AD domain controller. No outage expected. |
27
7:30am - 3:30pm: Planned emergency generator testing. Power may flicker. |
28
1am - 6am: Service outage for CruzTime (Campus Calendar) |
29
6am-8am: Planned outage of audience view server (av-prod-app-1:not website) for maintenance.
6am-8am: Planned outage of OTP2 SQL service for BAS for OS upgrade.
7:30am-8am: Planned outage of UC extention website (course.ucsc-extention.edu) for upgrade.
10:18pm: Unplanned Power Outage to campus due to city transformer issues. |
30
Monday-2:09am: Unplanned Power Outage to campus due to city transformer issues. Affected all of campus and partial city.
5am-5:30am:Planned outage of network affecting FIS, IDM (account Log-in/ changes), WWW2, ITRequest, C-File, urpb, itops print, and ad-prod.
Midnight-10:30am: Unplanned outage of remote access, library services, some dev/test services, events manager,sustainability, docushare and others due to power outage. Restoration of some as early as 9:40am.
5:30am-7am: Planned outage of network serving 2155 Delaware (UR, UCCP) for upgrade.
6am-6:30am: Planned outage of CruzNet wireless for upgrade.
6am-8am: Planned outage of campus FileMaker pro (fmp-prod-app-1) and Singularity Doc Mgt System for OS upgrade.
2:56pm-4:36pm: Urgent maintenance on www2-1 taken offline. www2-2 will take on load. No service outage expected. |
|
|
|
|
| |
| |