ITS Maintenance Calendar 2009

[ Jan ] [ Feb ] [ March ] [ April ] [ May ] [ June ] [ July ] [ Aug ] [ Sept ] [ Oct ] [ Nov ] [ Dec ] [2008 Calendar]
 
 
2:56pm:
Please contact Marian Sherrin if you have a question about the ITS maintenance calendar or outages.
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

July 2009

      1

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

8:00am: Removal of UC data and phone lines from Teacher's Center.

Tuesday-Ongoing: Intermittent service on Nextel phones.

3:15pm-3:45pm: Unplanned outage of some campus phones. Required reboot of message lights will occur by 4:45pm.

10:20pm-10:25pm: Urgent outage requred for SOE email maintenance.

2

7:30am - 8am: Planned outage of two web sites: courses.ucsc-extension.edu and 1ceinternal.ucsc-extension.edu for impletementing latest releases.

7:30am - ?: Unplanned outage of UC Extension Enrollment Manager.

Noon-12:15: Urgent outage required for Drupal security patch installation.

5pm - 7:30pm:
Planned outage of the Ledge-test server for patching.

5pm - 10pm: Planned outage of PPS.

3

Independence Day (observed)

7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.

4

5

1am - 6am: Service outage for CruzTime (Campus Calendar)

6am-10am: Planned outage fo Shibboleth for upgrade.

6

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

7

6am-9am: Planned outage of SOE Servers "sundance" and "moondance" for system upgrade.

6:30am-7am: Planned work on the network at 2155-G Delaware. Possibility of outage (phone and network).

7pm-Wed: Planned outage of UC Ready for server move (tentative).

8

Tues - 10am: Planned outage of UC Ready for server move (tentative).

9 10

6pm - 8pm: Planned outage of the Ledge server for patching.

11

12

8am - 5pm:Planned outage of the 12KV Power at Porter A, B, C, and D buildings.

1am - 6am: Service outage for CruzTime (Campus Calendar)

13

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

14

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

15 16 17

7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.

18

19

1am - 6am: Service outage for CruzTime (Campus Calendar)

20 21 22 23 24 25

26

1am - 6am: Service outage for CruzTime (Campus Calendar)

27 28 29 30 31  
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

August 2009

            1

2

1am - 6am: Service outage for CruzTime (Campus Calendar)

3

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

4 5 6 7

7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.

8

9

1am - 6am: Service outage for CruzTime (Campus Calendar)

10

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

11

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

12 13 14 15

16

1am - 6am: Service outage for CruzTime (Campus Calendar)

17 18 19 20 21

7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.

22

23

1am - 6am: Service outage for CruzTime (Campus Calendar)

24 25 26 27 28 29

30

1am - 6am: Service outage for CruzTime (Campus Calendar)

31          
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday
September 2009     1 2 3 4 5

6

1am - 6am: Service outage for CruzTime (Campus Calendar)

7

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

8 9 10 11 12

13

1am - 6am: Service outage for CruzTime (Campus Calendar)

14

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

15

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

16 17 18

19

Quarter Begins

20

1am - 6am: Service outage for CruzTime (Campus Calendar)

21 22 23

24

Instruction Begins

25 26

27

1am - 6am: Service outage for CruzTime (Campus Calendar)

28 29 30      
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday
October 2009         1 2 3

4

1am - 6am: Service outage for CruzTime (Campus Calendar)

5

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

6 7 8 9 10

11

1am - 6am: Service outage for CruzTime (Campus Calendar)

12

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

13

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

14 15 16 17

18

1am - 6am: Service outage for CruzTime (Campus Calendar)

19 20 21 22 23 24

25

1am - 6am: Service outage for CruzTime (Campus Calendar)

26 27 28 29 30 31
 
Month Sunday Monday Tuesday Wednesday Thursday

Friday

Saturday
November 2009

1

1am - 6am: Service outage for CruzTime (Campus Calendar)

2

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

3 4 5 6 7

8

1am - 6am: Service outage for CruzTime (Campus Calendar)

9

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

10

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

11 12 13 14

15

1am - 6am: Service outage for CruzTime (Campus Calendar)

16 17 18 19 20 21

22

1am - 6am: Service outage for CruzTime (Campus Calendar)

23 24 25 26 27 28

29

1am - 6am: Service outage for CruzTime (Campus Calendar)

30          
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday
December 2009     1 2 3 4

Instruction Ends

5

6

1am - 6am: Service outage for CruzTime (Campus Calendar)

7

Finals

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

8

Finals

9

Finals

10

Finals/Quarter Ends

11 12

13

1am - 6am: Service outage for CruzTime (Campus Calendar)

14

8am - Noon: Planned maintenance to the production server www2-1. No outage expected.

15

Grades Due

8am - Noon: Planned maintenance to the production server www2-2. No outage expected.

16 17 18 19

20

1am - 6am: Service outage for CruzTime (Campus Calendar)

21 22 23 24 25 26

27

1am - 6am: Service outage for CruzTime (Campus Calendar)

28 29 30 31    
 

 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

January 2009

     

 

1

All Day: Unplanned network outages to the EH&S trailers, Science Library, Stevenson Library, College 8 Bldg 7766

2

8am - 9am: Planned outage of the emergency electrical circuits at Natural Sciences 2, Annex, and CFAO.

9am - 9:45am: Unplanned outages of Business Objects and FMW

10:20am: Network service restored to the EH&S trailers, Science Library, Stevenson Library, College 8 Bldg 7766

5pm - 6pm: Planned outage of artstream.ucsc.edu

5pm Friday - 10am Saturday:
Planned Library Data Center outage

3

8am - 10am:
Planned electrical outage at McHenry Library

4

1am - 6am: Service outage for CruzTime (Campus Calendar)

5

Winter Quarter begins

3:20pm: Service restored to library services

6

Instruction Begins

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5am - 7am: Planned network outage at LML - POSTPONED until 1/7

6:45am - 7am: Planned outage of Ticketing Office services

3pm - 3:30pm: Unplanned outage of CruzID

10:22pm - 8:45am (Wednesday): Unplanned network outage at College 8 ResNet

7

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5am - 7am: Planned network outage at LML

8:45am: Network restored to College 8 ResNet

8

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

7am - 8am: Planned outage of OTP server

9am - 11am: Planned outage of Birdcam service

12pm - 2pm: Unplanned outage of SOE LDAP

2:30pm - 2:45pm: Urgent outage of CruzID

9

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

7:45am - 8am: Planned outage of University Extension web services

9am - 11am: Unplanned outage of Pinnacle and InfCom databases

1:30pm - 1:45pm: Unplanned outage of CruzID

5pm - 7pm: Planned outage of "ledge" server

7pm - 7:15pm: Planned outage of ITS FileMaker Pro server

10

7:30am - 11:30am
Planned electrical outage at McHenry Library

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

7am - Noon: Service restored to Library services

11

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

1am - 6am: Service outage for CruzTime (Campus Calendar)

12

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

2:20pm - 2:40pm: Unplanned outage of limited IC services (Ming Ong Server Room network)

2:22pm - 2:25pm: Unplanned outage of CruzNet at 2nd floor Kerr Hall

13

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5am - 7am: Planned 5-30 minute network outage at Long Marine Lab

5:30pm - 7pm: Planned outage of ledge

9:30pm: Proposed change to DC3 Firewall (RFC99)

14

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

6:30am - Noon: Planned outage of the campus VPN (vpn.ucsc.edu)

1:30pm - 2:40pm: Unplanned outage of CruzMail (campus email service)

15

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 16:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5am - 7am: CruzMail to require secure settings (RFC: CM-10)

6am - 6:05am: Planned partial network outage at McHenry library

7am - 8am: Planned outages of Time and Attendance databases, Div-Data, Staff HR FMP server, CruzAlert, OTP server

8am - 10:15am: Unplanned outage of OTP server

5pm - 5:30pm: Planned outage of financial.ucsc.edu

5:30pm - 6:30pm:
Planned network maintenance to 2901 Mission and University Business Park. No outage is expected.

11pm - 11:15pm: Planned outage of CUHS-WEB and CUHS-SQL

11:15pm - 11:30pm: Planned outage of FOODPRO

16

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

3:30am - 3:45am: Planned outage of SACOMP/SHO-PROD

3:31am - 3:45am: Planned outage of UDS-MICROS

4am - 4:15am: Planned outage of CBORD

7:30am - 7:45am: Planned outage of CCURE server

7:30am - 8am: Planned outages to University Extension services

9:45am - 10:24am: Unplanned outage of IT Request

7pm - 4am (Saturday): Planned outage of campus telephone service

17

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

18

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

1am - 6am: Service outage for CruzTime (Campus Calendar)

19

Martin Luther King Day

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

20

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5:30am - 6am: Planned short outage of AIS & MyUCSC

6am - 9am: Planned outage of SOE services

8am - 10am (Wednesday): Unplanned outage of Live Operator service for the Campus Telephone Directory

9:30am - 10am: Planned outage of IDM/LDAP servers

21

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

7am - 10am: Planned maintenance on the Campus Data Center network. No outages expected.

10am: Service restored to Live Operator service for the Campus Telephone Directory

12:30pm - 12:45pm: Planned outage of OCA

12:15pm - 1:28pm: Unplanned outage of CRUZCAT, WebPAC, LINK+, OCA ERES e-links

7pm - 7:30pm: Planned outages of COAST services

22

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

5:30am - 6pm: Planned maintenance in the Campus Data Center. No outages expected.

6am - 8am: Unplanned outage of cFile

 

23

8am Tuesday, Jan. 6 through 4pm Friday, Jan. 23:
Planned outage of the Central Cogen Engine. PG&E will still supply power to the campus.

8:30am: Unplanned outage of Citrix Web interface for Data Warehouse

10am - 11am: Planned outage of IDM

2pm - 7am (Monday): Planned outage of FIS and CruzBuy

24

All Day: Planned outage of FIS and CruzBuy

All Day: Unplanned outage of Citrix Web interface for Data Warehouse

25

1am - 6am: Service outage for CruzTime (Campus Calendar)

4pm: Service restored to FIS and CruzBuy

All Day: Unplanned outage of Citrix Web interface for Data Warehouse

26

7am: Service restored to FIS & CruzBuy

8:40am - 8:55am: Unplanned outage of CruzPay

10am - 11:20am: Unplanned outage of IT Request

7pm - 7:30pm: Planned outage of Pinnacle

12:39pm: Service restored to Citrix Web interface for Data Warehouse

5pm - 10am (Tuesday): Unplanned outage of UNEX website

27

7:30am - 9am
Emergency generator testing at Thimann Labs, Hahn Student Services, Classroom Units, and Health Center.

6am - 9am: Planned outage of SOE File, FTP and License servers

8:45am - 1pm: Planned maintenance with the BirdCam server. No outage expected

10am: Service restored to UNEX website

28

7:30am - 9am
Emergency generator testing at Cowell College and Infill, Stevenson College and Infill.

9:15am - 5pm: Unplanned intermittant outages with CruzMail

12pm - 1pm: Planned outage of fsaATLAS

29

7:30am - 9:15am
Emergency generator testing at Baskin Eng., Kresge College, and Infill.

6:45am - 7am: Planned outage of Telephone Outreach Program

9am - 1pm: Unplanned intermittant outages with CruzMail

9:38am - 9:40am: Unplanned network outage in BE

6pm - 8:30pm: Unplanned outage of Micros

7pm - 7:30pm: Planned outages of COAST services

7:15pm - 7:45pm: Planned outage of fsaATLAS

8pm - 8:30pm: Planned outage of LANDesk

8:30pm - 8:45pm: Planned outage of Foundation Accounting

 

30

7:30am - 9am
Emergency generator testing at College 9/10, SS1, SS2, and College 9 Apts.

 

31

7:30am - 9:15am
Emergency generator testing at Sinsheimer Labs, PSB, and Music Center.

 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

February 2009

1

1am - 6am: Service outage for CruzTime (Campus Calendar)

2

All Day: Intermittant unplanned outages of CruzMail

8:30am: Planned network maintenance in the data center. No outage expected.

3

7:30am - 9am
Emergency generator testing at College Eight.

All Day: Intermittant unplanned outages of CruzMail

5:30am - 6am: Planned short outages of AIS & MyUCSC

7am - 9am: Planned maintenance to SOE LDAP service. No outage expected.

10am: Planned network maintenance on data center firewall

4

7:30am - 9am
Emergency generator testing at Nat Sci 2.

9am - 10:30am testing at ISB Bldg., and C/M Apt.

All Day: Intermittant degraded performance of CruzMail

5

7:30am - 9am
Emergency generator testing at Earth and Marine, College 9 Dorms, Core West Parking, McHenry Library.

All Day: Intermittant degraded performance of CruzMail

6

7am - 8:30am
Emergency generator testing at CHP/Comm.

9am - 10:30am testing at SOE 2, C/M Commons, Firehouse/KZSC.

11am - 1pm: Unplanned degraded performance of CruzMail

6pm - 10pm: Planned outage of IT Request

7

7:30am - 9am
Emergency generator testing at Baytree Bookstore, Long Marine Lab, COH, Humanities, and 2300 Delaware.

12:30pm - 5pm: Planned network and telephone outage at Student Health Center

8

1am - 6am: Service outage for CruzTime (Campus Calendar)

9

7:19pm - 8:45pm: Unplanned degraded performance of CruzMail

6:30pm - 11:30pm: Unplanned outage of 20 websites (including ITS) and IT Request

10

7:30am - 9am
Emergency generator testing at Barn G, Emergency Response Ctr., Porter and Oakes College.

8:15am - 10:28am: Unplanned outage to Business Objects

8:21am - 10:30am: Unplanned outage of IT Request

10:30am: 10:35am: Unplanned network outage at Cowell Student Health Center

4pm: (RFC CM-18) Replace NIC cards on CruzMail

6:15pm - 7:30pm: Unplanned outage of CruzMail

6pm: (RFC CM-18): Replace NIC cards on CruzMail

11

9:30am - 1:30pm: Planned AT&T cable maintenance across from the Student Health Center.

6pm - 7pm: Planned outage of Student Health Center services

12

11pm - 11:15pm: Planned outage of CUHS-WEB and CUHS-SQL

11:30pm - 11:45pm: Planned outage of FOODPRO

13

3:31am - 3:45am: Planned outage of UDS-Micros & SHO-PROD

4am - 4:15am: Planned outage of CBORD server

4am - 6am: Planned outage of campus voicemail

7am - 8am: Planned outage for Academic HR FileMaker, Time and Attendance server, CruzAlert servers

7:30am - 7:45am: Planned outage of CCURE

9am - 5pm: Planned outage of OTP server

5pm - 5:30pm: Planned outage of Student Affairs Fixit website

5pm - 8pm: Planned outage of various PBSci Drupal based websites

6:55pm: Planned outage of humweb

7pm - 8am (Monday): Planned outages of COAST services

14

6am - 7pm
Planned electrical power outage at Thimann Labs and Kerr Hall. Emergency power will be available.

7:30am - 9am
Emergency generator testing at Communications Building, Kerr Hall, Theater Arts, and Portable Generators.

12am - 8pm: Planned outage of Media Services web server and Classroom Infobase

3:10am: Planned outage of frodo

All Day: Planned outages of COAST services

15

1am - 6am: Service outage for CruzTime (Campus Calendar)

All Day: Planned outages of COAST services

7pm - 7am (Monday): Planned maintenance on IT Request. No outage expected.

16

President's Day

Service restored to COAST services

17

6am - 9am: Planned outage of SOE file servers

6:30am - 6:45am: Planned outage of Telephone Outreach

11:15am: (RFC CM-26) CruzMail buffer configuration change

7pm - 8pm: (RFC CM-25) Remove old CruzMail webskins - Postponed until 2/24

7pm - 9pm: Planned outage of various Student Health Center servers

8:45pm - 9pm: Planned outage of Foundation Accounting

10pm - 8am (2/18): Unplanned outage of News & Events on campus website

18

All Day: Planned maintenance to CruzNet. No outage expected

1:45pm - 2:39pm: Unplanned network outage at UCO Lick

7:30pm - 9:30pm: Planned outage of Staff HR servers

19

7pm - 8:45pm: Planned outage of Business Objects, Infoview

7pm - 9pm: Planned outage of Student Health Center servers

7pm - 11pm: Planned outage for CruzTime

8:15pm - 8:45pm: Planned outage of Pinnacle

8:45pm - 9:15pm: Planned outage of fsaATLAS

9:15pm - 9:45pm: Planned outage for LANDesk

 

 

20

9:30am - 1:35pm: Unplanned degraded performance of telephone system. (Dial tone and message waiting lights)

10:15am - Unscheduled emergency generator shutdown at Stevenson College for repairs

2pm - 5pm: Planned outage of fsaATLAS

21
22

1am - 6am: Service outage for CruzTime (Campus Calendar)

8:20pm - 9:21pm: Unplanned network outage at ResNet College 9

23

8am - 9am: Planned outage of the Ticketing Office service

24

6am - 9am: Planned outage of SOE servers

2:50pm - 1pm (Wed): Unplanned outage of Library Filemaker servers

9pm - 11pm: (RFC: CM-24 and CM-25) Planned upgrade of CruzMail and CruzMail web client. See FAQ for more info.

25

7am - 8am: Planned outage of santacruztickets.com

9:20am - 11:45am: Unplanned performance issues with CruzMail

1pm: Service restored to Library FileMaker servers

26

7pm - 8pm: Planned outage of COAST services

8:35am - Midnight: Unplanned outage of CruzPay

27

6:30am - 7am: Planned (30 second) network outage at Crown & Merrill.

11am - 11:25am: Unplanned outage of CruzPay

28

Noon - 1:30pm: Unplanned outage of library home page

 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday
March 2009 1

1am - 6am: Service outage for CruzTime (Campus Calendar)

 

2

6:30am - 11:25am: Unplanned outage of CruzPay

1:55pm - 2:06pm: Unplanned outage of Library Off Campus Access proxy server

2:16pm: Public key authentication disabled on unix.ic.ucsc.edu

3

8am Tuesday, 3/3 through 12pm Wednesday, 3/4:
Planned outage of the emergency generator at Stevenson Academic and Res. Halls.

5:30am: Planned network maintenance at McPherson. No outage expected.

8am - 5pm (3/5): Planned outage and maintenance to IdM

8:50am - ongoing: Unplanned connectivity problems with CruzPay

9am - 11am: Planned ouatge of LANDesk server. No client impact.

5:30pm - 6:12pm: Unplanned outage of ResNet in Kresge House 04

 

4

7:30am - 7:45am: Planned outage of UNEX website

All Day: Planned outage to IDM

8am - 10am: Unplanned performance degradation of CruzPay

7pm - 7:30pm: Planned outage of COAST services

5

10:40am - 11:05am: Unplanned outage of Library FileMaker server

5pm: Service restored to IdM

10:15pm - 3am (Friday): Unplanned outage of cFile

6

3am: Service restored to cFile

8am - 11am:
Planned outage of the emergency power at Porter A & B Dorms.

7

4am - 10pm: Planned outage of AIS and MyUCSC

All Day: Planned maintenance to UNEX servers

8

1am - 6am: Service outage for CruzTime (Campus Calendar)

All Day: Planned maintenance to UNEX servers

9

10:20am: Planned outage of humweb.ucsc.edu

10pm: Planned outage of humbweb.ucsc.edu

10

9pm - 11pm: (RFC: CM-31 & CM-32) Planned changes to CruzMail (reinstate zip files and remove mail restrictions)

11

7:30am-8:00am: Planned outage of phone service at Shaffer Rd. Bldg.

8am - 12 midnight: Unplanned message light problem on digital phones.

9pm-10pm: Planned outage of CruzID Manager.

12

7am-8:12am:Planned outage of the following services: Div Data, OTP2, Filemaker Time and Attendance, and WARN server.

7:30am-7:45am: Planned outage of phone service at Shaffer Rd. Bldg (affects 14 people only)

11pm-11:15pm: Planned outage of various Student Affair's Web Applications on CUHS-WEB and CUHS-SQL servers.

11:15pm-11:30pm: Planned outage of University Dining's Food Stuff and Recipe application on the FOODPRO server.

13

3:30-3:45am: Planned outage for Universtiy Dinings point of sale application (UDS-Micros server). Dining hall will be closed at this time so no expected impact..

3:30-3:45am: Planned outage of Student Housing Online (SHO).

4am-4:15am: Planned outage of CBORD for patching. Impacts University Dining's Odyssey application.

7:30am-7:45am: Planned outage to door access system (CCURE-0) affecting Kerr Hall, Oakes, College 9/10, and Porter colleges.

8am-5pm: Planned Maintenance to CruzID (IDM) to improve performance. No outage anticipated.

Noon-2pm: Planned outage of network and telephone services at campus fleet garage.

2:30pm-3:30pm: Digital phone intermittent message lights due to reset of operating system.

 

14
15

1am - 6am: Service outage for CruzTime (Campus Calendar)

7am - 6pm: Planned outage of FIS

5:28pm - ongoing: Unplanned network outage at NASA Ames

16

Instruction Ends

7am - 8am: Planned outages of MOSS and FMP services

Sunday - 10:30pm: Unplanned network outage at NASA Ames

6:10pm - Ongoing:Unplanned outage of Business Objects and FMW

17

Finals

Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.

5am-7am: Planned network testing. No outage expected.

7:30am - 8am: Planned outage of SOE file servers (FS1 & FS2)

8am-9:45am: MyUCSC (AIS) password reset incident

10:07am-2:08pm: Unplanned outage of Virtual Computer Lab

7pm - 8pm: (RFC: WWW-36) Planned upgrade to Campus Calendar. Short outage expected.

18

Finals

Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.

5am-7am: Planned network testing. No outage expected.

7pm-8pm: Planned outage of CRT.

8:40pm-9:20pm: Planned outage to to Pinnacle.

9:20pm-10pm: Planned outage to LANDesk.

8pm-Ongoing: Unplanned outage of CRT.

19

Finals

Midnight-Ongoing:Unplanned outage of DW Business Objects and FMW.

Midnight-7:20am: Unplanned outage of CRT. Some files weren't restored until 9:50am.

20

Finals

Winter Quarter Ends

Midnight-8:15pm :Unplanned outage of DW Business Objects and FMW.

9am-7:30pm: Planned outage of Filemaker.ucsc.edu (Filemaker Production server). Outage could continue over the weekend.

7pm-9pm: Planned maintanence of its-prod-vcenter-1 ESX cluster. SysAdmin may experience console access outages.

 

21

7am - 12pm: (Noon)
Planned outage of the electric power at McHenry Library Old and New Sections.

6:30am - 12pm (noon): Planned outage of library.ucsc.edu, cruzcat.ucsc.edu and eres.ucsc.edu due to above power outage.

8am - 3pm:
Planned outage of the electric power at Porter Administration and Academic Building D.

10am: Planned retirement of unix1.ic.ucsc.edu (public sparc timeshare)

All Day: Planned outage of filemaker.ucsc.edu

22

1am - 6am: Service outage for CruzTime (Campus Calendar)

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

All Day: Planned outage of filemaker.ucsc.edu

7am-8am: Planned outage of Ticket Office/Audience View for OS Updates.

23

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

6:40-7:00am: Planned Outage of Telephone Outreach.

7:30am-10am: Maintenance work beign done on the Network (HPR-G). No outage expected.

3:30pm-8:15pm: Unplanned outage of email from www2 hosts (as-prod-web-1|2). Blocked due to SPAM originating from site.

7:00pm-9:20pm: Planned outage of Business Objects for maintenace and backup.

9:20pm-10pm: Planned outage of fsaAtlas.

10pm-10:20pm: Planned outage of Foundation Accounting

24

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

5am-7am: Upgrade on campus network core router Comm-G. No outage expected

7am - 8am: Planned outage of SOE Moodle service

7:30am-10am: Maintenance work being done on the Network (ISP-G). No outage expected.

2:30pm - 6pm: Planned outage of CBORD server

7pm-8pm:Planned Outage of COAST servers for maintenance.

25

Grades Due

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

7am-9am: Planned outage of SOE project directory for server migration/upgrade.

7:30am-10am: Maintenance work being done on the Network (DC-G). No outage expected.

10am - 10:30am: Planned outage of ResNet

10:05am-10:35am: Unplanned outage of CruzID Manager.

11:30am-1:30pm: Unplanned outage of phones at Crown-Merrill and restore of campus phones. Some may experience message light problems.

7pm-Midnight: Planned outage of COAST Servers.

26

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

8am - 12pm (Noon)
Planned outage of the electric power at Humanities Lecture Hall.

8am - 4pm: Planned outage of electrical power at Kresge Residence Halls R-6,7,8.

6:45pm-7:20pm: Unplanned campus power outage.

4am-8am: Planned outage to most Wireless Access Points (WAP) for ~5minutes sometime during this period.

7am-9am: Planned outage of SOE project directory for server migration/upgrade.

11am-11:50am: Unplanned outage of InfoView.

5pm-Ongoing: Planned outage of multiple Humanities file services on server file (frodo.ucsc.edu)

6:45pm-Midnight: Unplanned outage of some campus networks and file servers due to unplanned power failure.

27

Cesar Chavez Day

8am-8pm: Work on power to campus. Some risk of power failure. Cogen running.

All day: Unplanned network failures due to power failure.

Midnight-8am: Planned outage of multiple Humanities file services on server file (frodo.ucsc.edu)

7pm - Monday 7am: Planned outage of CruzBuy for software upgrade.

28

All Day: Planned outage of CruzBuy for software upgrade.

29

1am - 6am: Service outage for CruzTime (Campus Calendar)

All Day: Planned outage of CruzBuy for software upgrade

30

Spring Quarter Begins

Midnight-7am: Planned outage of CruzBuy for software upgrade.

Noon-12:44pm: Unplanned outage of Library Directory.

31

Instruction Begins

5am-7am: Planned 10G upgrade of network (isb-g). No outage is expected.

4:45pm-5:05pm: Unplanned outage of CruzID.

7pm-8pm: Planned outage of COAST servers including email, document mgt, Citrix, and Web Survey.

7pm-9pm: Planned outage of the following production servers: ALI, CCM, Harriet, Phonetics1, its-nav-mon-1 and other ITS dev and test servers.

7pm-8pm: Planned outage of Campus Events Calendary for upgrade fix.

8pm-10pm: Planned outage of ITRequest for upgrade.

8pm-Ongoing: Planned outage of remote access for UC Extension (Conflicker Worm preventive action)

 

       
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

April 2009

      1

8am - 4pm: Planned outage of stand-by electrical power at the Physical Sciences Building. Emergency power will be available.

Midnight-5pm: Planned outage of remote access for UC Extension (Conflicker Worm preventive action)

Noon-1pm: Planned upgrade to erc-g router power supplies. No outage expected.

7:30pm-9pm: Planned outage of Staff HR services for maintenace.

2

8am - 4pm: Planned outage of stand-by electrical power at the Physical Sciences Building. Emergency power will be available.

4:15pm-4:25pm: Unplanned outage of CruzID Manager.

7pm-9pm: Rescheduled to 4/9/09: Planned outage of Student Health Services.

7:30pm-9:pm: Urgent Maintenance Outage of ADFS (includes Banner forms and UR Portal).

Evening: Planned urgent CruzID Manager configuration change. No outage expected

3

8am - 4pm: Planned outage of the emergency generator power at Engineering 2.

 

4

5

1am - 6am: Service outage for CruzTime (Campus Calendar)

6

7am-5pm: Cell tower work near College8. AT&T, T-Mobile Cell coverage limited.

3pm - 4:20pm: Unplanned outage of the Academic Information System (AIS)

 

 

7

7am-5pm: Cell tower work near College8. AT&T, T-Mobile Cell coverage limited.

7:30am-7:45am: Planned outage of library systems.

8am-4pm: Cell tower work near College9/ SocSci.

Noon-3:30pm: Unplanned outage/intermittent service of lecture Webcast server. Problems may continue to be intermittent.

8

9:30pm-11pm: Cancelled: Planned outage of CruzID. No logins requiring gold passwords available nor password changes.

8am-4pm: Cell tower work near College9/ SocSci.

9

7pm-9pm: Planned outage of Student Health Services systems for maintenance.

2:32am-11:18pm: Regional fiber cable out affecting cell phone service, some long distance phone service, and internet links outside the local area. Cable is cut between Santa Cruz and Gilroy.

11:59am - 11:18pm: Unplanned outage of BE105 Workstations, IC Unix, WebCT, WWW2, and some Kerberos logins. Believe linked to Cable cut.

10

7pm-April 12: Planned Outage DWH EFM Surveys.

11

All Day: Planned Outage DWH EFM Surveys.

12

1am - 6am: Service outage for CruzTime (Campus Calendar)

6am-8am: Planned outage of AIS Campus Solutions 9.0 and MyUCSC.

12:26pm-12:27pm: Unplanned outage of T-1 Network at 509 Swift.

All Day: Planned Outage DWH EFM Surveys.

13

11:19am-Noon: Unplanned outage of a security firewall (dc3). Other unplanned outages (www, www2, FIS) reported as well. Connection between these is unknown at this time.

14

9:54am-9:58am: Unplanned outage of Network Internet Service.

15

4:15pm-5:10pm: Unplanned Power affecting upper campus. Lower campus and off campus buildings (aka Delaware) not impacted.

7am-9am: Planned maintenance of several administrative websites (ada, bas, emergency, lasersafety). No outage expected.

7pm-9pm: Planned outage of CruzID Manager for patching.

7pm-10pm: Planned outage of 2 servers for maintnenace with impact as follows: Filemaker time and attendance databases for CBO, ITS, SHS, UARC, PBSci, etc. Also CruzAlert server.

8pm-9pm: Planned upgrade to CruzMail. No outage expected.

16

6am-8am: Planned outage of SOE Server for maintenance.

5pm-Ongoing: Previously unannounced outage of Library data center HVAC causing system instability of serveral library applications

11pm-11:15pm: Planned outage of CUHS-WEB and CUHS-SQL servers hosting various Student Affairs applications for maintenance.

11:15pm-11:30pm: Planned outage of FOODPRO for maintenance.

Midnight-Ongoing (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

17

Midnight-9:30am: Previously unannounced outage of Library data center HVAC causing system instability of serveral library applications

3:30am-4am: Planned outage of UDS-Micros. No campus impact expected.

4am-4:14am: Planned outage of CBORD hosting Odyssey for maintenance.

7am--7:05am:Cancelled: Planned outage of Audience View/Ticket office for security upgrade.

7:30am-7:45am: Planned outage of CCURE hosting Kerr Hall, Oakes, College 9/10, and Porter exterior doors.

5pm-7pm: Planned outage of ledge-test.

7pm- Ongoing: Planned Outage of UC LMS system.

All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

 

18

Midnight-2pm: Planned outage of UC LMS system

7am-Monday: Planned outage of FIS for OS upgrade.

19

1am - 6am: Service outage for CruzTime (Campus Calendar)

All Day: Planned outage of FIS for OS upgrade.

All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

20

Midnight-7am:Planned outage of FIS for OS upgrade.

7am-7:05am: Planned outage of AudienceView remote authentication.

7:30am-7:35: Planned maintenance of VPN. No outage expected.

9am-5pm: Planned upgrade to digital phone displays. No outage expected.

All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

21

5:30am-8am: Planned outage of SOE mail for server move.Msgs will stay in the queue and be sent when move is complete.

7am-7:15am: Planned outage of SOE websites for migration.

5:15pm - 8pm: (RFC CM-75) NVRAM replacement on NAS. No outage expected.

6:37pm-9:55pm: Unplaned outage of College 9 phones.

9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.

All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

22

8am-9am: Unplanned message light issues on some phones.

10am - Noon: Planned network outage at SVC/UNEX

7pm-8pm:Planned outage of OTP2 HPA database and DivData.

7pm-8pm: Planned outage COAST Services (email, file, print, and web).

9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.

All day (until 4/22): Unplanned network distruption in Porter/Kresge Residences.

23

10am-1pm: Planned outage of library file sharing/Samba service, beast.library.ucsc.edu

9pm-Midnight: Planned maintenance on VM production clusters. No outage expected.

7pm - 9pm: Planned outage of Student Health Services

24

1:30pm-2:45pm: Unplanned outage of network in Sinsheimer Lab.

6pm-8pm: Planned outage of ledge for maintenance. .

25

9am-5pm: Planned outage for CruzMail (tentative)

26

1am - 6am: Service outage for CruzTime (Campus Calendar)

27

7am-8am: Planned outage of MOSS and Filemaker servers: its-prod-moss-1, its-prod-sql-5, and fmp-prod-app-1 for maintenance.

7am-10am: Planned outage of Audience View. Users will be able to complete transactions, but no new logins will be available.

Noon-1:30pm: Planned outage of fsaAtlas for upgrade.

28

5:30am-7am: Planned outage of CruzNet and CruzNet Secure wireless networking.

6am-9am: Planned outage of SOE File Server FS2 for move.

9am-Noon: Planned outage of library file sharing/Samba service, beast.library.ucsc.edu

2:50pm-3pm: Unplanned disruption to CruzMail.

29

6am - 6:30am: Planned outages for multiple services (Foundation Acct, Telephone Outreach)

7:30am-11am: Planned outage of Engergy Management hub 136 in Engineering 2.

7pm - 10:15pm: Planned outage for multiple services (Business Objects, fsaATLAS, LANDesk, Pinnacle)

7pm-8pm: Planned outage of Singularity for maintenance.

30

3pm - 4:35: Unplanned error messages in the IT Request Ticket system.

7pm: Planned maintenance of CruzTime (URL redirect). No outage expected.

 

   
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday

May 2009

          1

Midnight-9:55am: Unplanned outage of CruzTime on the web.

11:15pm-11:30: Planned outage of CruzID for maintenance. Users may loose connection momentarily.

2

3

1am - 6am: Service outage for CruzTime (Campus Calendar)

4

3:30: Planned reboot of CruzNet Router (wlsm2-g). No outage expected.

5

3:31am-3:51: Planned maintenance on UDS-Micro Dining POS system. No outage expected (dining closed).

5am-8am: Planned maintenance on Comm-g network. No outage expected.

7pm-?: Planned maintenance on WWW. RFC is WWW-51. No outage ezpected.

9:30am-11am: Planned upgrade to CruzID Manager. No outage expected.

6

10:00am-10:16am: Unplanned Campus Power outage. Delaware not impacted.

8:30am-9:03am: Unplanned outage of ITRequest.

7pm-10pm: Planned outage of Singularity DMS for maintenance.

7

5:01pm-6pm: Planned outage of Singularity DMS for urgent service pack update.

8

6:30am-9:30am: Planned Campus Power work at Merril Substation. No outage expected.

7:45am-8am: Planned outage of Extension Exchange Mail for login bug fix.

9
10

1am - 6am: Service outage for CruzTime (Campus Calendar)

11

2:30pm-3pm: Urgent testing of Hanh power supplies.No outage expected.

12

9:30am - 11am: Planned maintenance to Shibboleth. No outage expected.

11am-3:45pm: Unplanned outage of Connexxus due to Shibboleth change.

13

7:30pm-9pm: Planned outage of Staff HR services for maintenance.

14

7pm-9pm: Planned outage of Student Health Services for maintenace.

11pm-11:15pm: Planned outage of CUHS-WEB and CUHS-SQL servers hosting various Student Affairs applications for maintenance.

11:15pm-11:30pm: Planned outage of FOODPRO for maintenance.

15

3:31am-4am: Planned outage of UDS-Micros. No campus impact expected.

4am-4:14am: Planned outage of CBORD hosting Odyssey for maintenance.

7:30am-7:45am: Planned outage of CCURE hosting Kerr Hall, Oakes, College 9/10, and Porter exterior doors.

9:30am-4:30pm: Unplanned suspension of www2 webform email.

16

8am-8pm: Planned outage of AIS and MyUCSC portal for maintenance.

5pm-Midnight: Planned upgrade to our Data Center VM Environment. No outage expected.

 

17

1am - 6am: Service outage for CruzTime (Campus Calendar)

18 19

8am - 4pm: Planned outage of the emergency generator at the Fire House. Electrical power will still be available.

6am-9am: Planned outage of SOE Interactive servers sundance, moondance, apache.

7:30am-9am: Planned maintenace to BSOE LDAP servers. No outage expected.

9:30am-11am: Planned maintenance for CruzID. No outage expected.

3:10pm - 3:20pm: Unplanned outage of the CruzID Manager.

7pm-9pm: Planned outage of ITS web dev and test, sql test, phonetics, and its-nav-mon-1 servers for maintenance.

7pm-9pmPlanned outage of web servers (www.ucsc.edu, its-prod-web-01,02 & its-prod-sql-06) for maintenance. The only outage will be to the News and Events and calendar web pages.

7:30pm-8:30pmPlanned outage of the DWH production Database server for testing.

20

1pm: Unplanned outage of the residential network at College Nine.

5pm - 11pm: Planned upgrade on the DWH system (dwh-prod-ora-1).

5pm - until Noon on 5/21: Planned outage of FMW, Business Objects, and Infoview XI for database upgrades.

6:30pm-9pm: Planned outage of Student Health Services servers for maintenance.

 

21

9:30am-5pm: Planned outage of CruzPay for VM upgrade.

9pm - until morning of 5/22: Planned outage of FMW, Business Objects, and Infoview XI for database upgrades.

22

7am - 7:30am: Planned outage of Hub282 at Kresge Commons: Bldg 379.

9:30am - 10am: Planned outage of Hub808.resnet at the Village Bldg 7019.

23
24

1am - 6am: Service outage for CruzTime (Campus Calendar)

6am-10am: Planned outage of CruzID Manager.

25

Memorial Day

26

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7pm - 7:30pm: Planned outage of Pinnacle. Patch installations.

8pm-10pm: Planned outage of www2.ucsc.edu web sites for system maintenance.

8pm-10pm: Planned outage of MySQL server. Apps impacted: IT Request, CRT, Summer Session, Biobibnet, Web Templates, OTP, UR Give, Dept. Directory, Water Project.

27

6am - 6:30am: Planned outage of Foundation Accounting and Telephone outreach program. Patch installations.

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7:30pm - 9:15pm: Planned outage of Business Objects, Infoview, fsaATLAS, and LANDesk. Patch installations.

4pm - 6pm: Planned outage of the Moira.

28

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

2pm: Planned work to the delaware-ds distribution switch at 2300 Delaware. No outage expected.

6pm - 7pm: Planned outage of the Student Health Center Point and Click app.

8pm - 8:15pm: Planned outage of the Online Tag Program.

 

29

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

 

30

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

8am - 10am: Planned work to retire dc1, dc2, and dc3 servers.

31

1am - 6am: Service outage for CruzTime (Campus Calendar)

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

           
 
Month Sunday Monday Tuesday Wednesday Thursday Friday Saturday
June 2009   1

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7am - 11am
Unplanned outage of the ITS Collab tool.

6pm - 10pm: Planned outage of dev server www2-dev for maintenance.

6:30pm - 9pm: Planned outage of the Student Health Services servers.

2

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

9am-Ongoing: Unplanned outage of FITC Lab 202 Crown Library Building due to plumbing leak.

3

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

8am: Unplanned outage of the emergency generator at the Physical Sciences Building.

Midnight-Ongoing: Unplanned outage of FITC Lab 202 Crown Library Building due to plumbing leak.

9pm-Next day: Planned outage of Moira for upgrade.

4

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

Midnight-3:30pm: Planned outage of Moira for upgrade.

Midnight - 5am: Unplanned maintenance on ITS Collab Tool.

9am-5pm: Planned outage of Student Housing Online (SHO).

 

5

Instruction Ends

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

10am-11am: Planned maintenance to CruzID Manager. No outage expected.

1:15pm - 1:30pm: Unplanned outage/connectivity of CruzPay.

6

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7

1am - 6am: Service outage for CruzTime (Campus Calendar)

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

8

Finals

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

6am-9am: Planned maintenance to phone trunks. No outage expected.

8am - Noon: Planned work to the production server www2-1. No outage expected.

9pm-midnight: Urgent (unannounced) maintenance of CruzID - rolling log offs possible..

9

Finals

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

8am - Noon: Planned work to the production server www2-2. No outage expected.

2:45pm-5:45pm: Unnounced outage of CruzID (Account) Directory.

4:14pm-5:30pm: Unplanned outage of Moira.

8pm-10pm: Planned maintenance on ITR. No outage expected.

10

Finals

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7:30am-8am: Planned outage of several UC Extension servers/services (email, website, ucscext domain, print server, OneCE, file server, student DHCP).

7pm - 11pm: Urgent Maintenance on WWW, WWW2 (its-prod-web-01 & 02), no outage expected.

9:30pm-9:50pm: Planned outage of CRT for upgrade.

 

 

11

Finals

Quarter Ends

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7:30am-7:45am: Planned maintence of CCURE-0 Door access.

3:30pm-3:45pm: Planned outage of SHO for critical update.

7pm-9pm: Planned maintenance to IDManager and WWW2. No outage expected.

10pm-10:50pm: Urgent maintenance to Audience View.

11:45pm-midnight: Planned outage of FOODPRO server for maintenance.

12

Commencements

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

6pm-8pm: Planned outage of ReadyTalk for upgrade.

7pm-8pm: Planned outage of ITS Collaboration Tool for server move.

9pm-11pm: Planned outage of Moira and Listmaint for maintenance.

13

Commencements

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

7:15am-1:30pm: Unplanned outage of NASA Ames network connection.

8am-10am: Planned outage of "ad" network login domain. Minimal outage expected.

10am-7pm: Planned outage of CruzBuy for maintenance.

 

14

Commencements

1am - 6am: Service outage for CruzTime (Campus Calendar)

15

6:30am - 2:30pm: Planned electrical outage at Cowell and Stevenson College, plus Chadwick Garden. Emergency generators will be running.

10:30am-11:40am: Unplanned outage of Zimbra mail server.

16

Grades Due

7am - Noon: Planned electrical work to the Humanities Lecture Hall. Power will be shut down.

6am-9am: Planned outage of SOE Interactive and Compute servers (sundance, moondance, apache) for upgrade.

7pm-10pm: Planned outage of Div Data, Time and Attendance calendars, and WARN DB for OS update.

7pm-10pm: Planned maintenace for ITS-dev-web and ITS-test-web, sql.

17

6:30am - 6:30pm:Planned electrical work to Crown Merrill Apt. and colleges, Fire Dept. KZSC Tower, and Tower Farm. Emergency generators will be running.

All Day: FITC will be closed due to above electrical work.

9:30am-10:15am: Unplanned outage of PBSci Filemaker Pro DB.

12:15pm-2:15pm: Planned maintenance of Wireless System Manager (WLSM). No outage expected.

7pm-10pm: Planned outage of staff HR servers (DC1, DC2, FS-1, Prod-FMP-1, Shrsrv02) for maintenace.

18

7am - 7pm: Planned electrical work on power to campus. No outage expected.

5am-7am: Planned outage of CBORD for Summer student upload.

8:05am-8:10am: Unplanned power outage to Comms bldg.

10am-Noon: Planned ResNet outage for upgrade.

3pm-3:30pm: Unplanned outage of Edgar.

5pm-6pm: Planned outage of MOSS for SP-2 upgrade. WWW-75

7pm-10pm: Planned outage of Student Healthe Services servers (APP-1, APP-2, PNC-FS, Web-1, Prod, and SHS-TS-1) for maintenace.

9pm-Midnight: Planned maintenance to CruzMail. No outage expected. CM-77.

11pm-11:15pm: Planned maintenance of CUHS web and SQL servers. No outage expected.

19

7am - 7pm: Planned electrical work on power to campus. No outage expected.

4am-6am: Planned outage of campus voicemail for maintenance.

7am-7:45am: Planned Outage of CruzNet for upgrade, small (5min) gaps in service may be experienced.

2:50pm-4:10pm:: Unplanned outage of CruzNet wireless system in various locations across campus.

5pm-Midnight: Planned outage of Library Slides Service (slides.library.ucsc.edu)

7pm-11pm:Planned maintenance on VMWare ESX Servers. No outages expected.

7pm-8pm: Planned outage of CruzBuy for vendor maintenance.

20

7am - 1pm: Planned electrical power outage at McHenry Library. Emergency power will be available.

Midnight-10am: Planned outage of Library Slides Service (slides.library.ucsc.edu)

12:58-2:15pm: Un planned outage of financial.ucsc.edu.

7:30am-10am: Planned outage of Library Services (OCA, CruzCat, Web, Library, Filemaker, Slides, Mail Server).

21

1am - 6am: Service outage for CruzTime (Campus Calendar)

22

6:30am-7:00am: Planned outage of University Relations

5:15pm-6:15pm: Planned outage of arts.ucsc.edu for server upgrade.

7pm-7:30pm: Planned outage of Pinnacle for maintenance.

23

6am-9am: Planned outage of SOE file servers fs1 and fs2 for maintenance.

6:30am-6:40am: Planned maintenance of campus network connection. No outage expected.

9am-11am: Planned maintenace to IDM. No outage expected.

9:30-11am: Planned outage of CruzNetSecure for certificate change.

8pm-10pm: Planned outage of ITRequest for virtual move.

8pm-10pm: Planned outage of www2 databases for maintenance. Websites affected are: Humanities, SocSci, ITS, ehs, Office of Campus Life, Residential Networking, Giving Catalog, Center for Itegrated Water Research.

24

6:00am-9:30am: Unplanned outage of ITRequest, Biobibnet, & OTP.

8am- 9am: Unplanned service disruption - some email servers running slow. Connections lost.

6:30am-6:40am: Planned upgrade to campus network. No outage expected.

7pm-8pm: Planned outage of COAST servers for maintenance: admbackup, admdb01, admdc01, admdc02, admdc03, admex03, admf01, admprn01, admwa01, admxerox, pbctx01, pbdc01, pbdev01, pbnas01, pbrpts, pbsvcs, uarc-svc01.

 

25

7am - 9am: Planned electrical outage at the Academic Resources Center.

2:12am-10:37pm: Unplanned outage of multiple data center servers including: FIS, CruzBuy, Audinece View, IDM, ITRequest, ITSOps, and as, bo, ur, and WARN update.

10:31am-2:18pm: Unannounced outage of UC Ready.

7pm-8:45pm: Planned outage of Business Objects.

8:45pm-9:15pm: Planned outage of fsaAtlas for maintenance.

9:15pm-9:45pm: Planned outage of LANDesk for maintenance.

26

11:25am-11:45am: Emergency maintenance to CruzID. Not outage expected.

5pm-6pm: Planned outage on one AD domain controller. No outage expected.

27

7:30am - 3:30pm: Planned emergency generator testing. Power may flicker.

28

1am - 6am: Service outage for CruzTime (Campus Calendar)

29

6am-8am: Planned outage of audience view server (av-prod-app-1:not website) for maintenance.

6am-8am: Planned outage of OTP2 SQL service for BAS for OS upgrade.

7:30am-8am: Planned outage of UC extention website (course.ucsc-extention.edu) for upgrade.

10:18pm: Unplanned Power Outage to campus due to city transformer issues.

30

Monday-2:09am: Unplanned Power Outage to campus due to city transformer issues. Affected all of campus and partial city.

5am-5:30am:Planned outage of network affecting FIS, IDM (account Log-in/ changes), WWW2, ITRequest, C-File, urpb, itops print, and ad-prod.

Midnight-10:30am: Unplanned outage of remote access, library services, some dev/test services, events manager,sustainability, docushare and others due to power outage. Restoration of some as early as 9:40am.

5:30am-7am: Planned outage of network serving 2155 Delaware (UR, UCCP) for upgrade.

6am-6:30am: Planned outage of CruzNet wireless for upgrade.

6am-8am: Planned outage of campus FileMaker pro (fmp-prod-app-1) and Singularity Doc Mgt System for OS upgrade.

2:56pm-4:36pm: Urgent maintenance on www2-1 taken offline. www2-2 will take on load. No service outage expected.